Accienta · Autodesk Gold Partner · Dubai
Autodesk Gold Partner · GCC · EMEA · Customisation Specialists

Autodesk Construction Cloud Customisation — Built for How Your GCC Project Actually Works.

Your team purchased Autodesk Construction Cloud — now Autodesk Forma. The licences are active. The platform is live. But your project structures do not match your contract, your RFI workflows are not connected to your team's approval chain and your site team is still using WhatsApp because nobody configured the platform for how your project actually delivers. Accienta's customisation service fixes this — configuring every part of your Autodesk Forma environment specifically for your GCC project, your team structure and your workflows before a single user logs in.

⚠ Important — Autodesk Construction Cloud is now Autodesk Forma

As of 24 March 2026, Autodesk Construction Cloud (ACC) was renamed to Autodesk Forma. This is a branding change only — your existing licences, projects, workflows and data are unchanged. Forma Build = former Autodesk Build. Forma Data Management = former Autodesk Docs. Forma Design Collaboration = former BIM Collaborate Pro. Accienta configures all of these, under both names.

Autodesk Gold Partner — EMEA & GCC
BIM 360 Docs & Build accredited
Configured before go-live
GCC project delivery specialists
Autodesk Forma — Accienta Custom Setup
GCC Config
ISO 19650 folder structure + naming
Configured ✓
RFI workflows — contractual routing
Configured ✓
Permission levels by role + company
Configured ✓
Mobile snagging templates — ITP aligned
In progress
Revit model publishing — BIM integration
Building
60%
Snagging reduction — Khansaheb
0
Clashes on site — Mira Dev.
E2E
Configured before go-live

Why Most Autodesk Forma Deployments Fail — and What Accienta Does Differently

The most common Autodesk Construction Cloud / Forma deployment failure is not a software problem. It is a configuration problem. A platform that was set up generically — or not set up at all — and handed to a project team to figure out while simultaneously delivering a live construction programme. Accienta's customisation service exists specifically to prevent this.

Without Accienta customisation
Your team receives logins to a blank Autodesk Forma environment and is expected to build their own folder structure, RFI workflows and permission levels while simultaneously delivering a live project — the project always takes priority and the platform never gets properly configured
A folder structure is set up by whoever has time — not by someone who understands ISO 19650 naming conventions, GCC authority submission requirements or how your contract separates main contractor, subcontractor and consultant access
RFI workflows are configured generically — not aligned to your contractual response periods, your consultant routing chain or your specific programme requirements — creating contractual risk every time an RFI is late because the platform did not escalate it correctly
Site teams revert to paper punch lists and WhatsApp because the mobile environment was never configured with their actual ITP templates, their snagging categories or their daily report structures — the platform exists but the site team does not use it
Six months into the project, your client's information auditor finds your CDE does not meet the ISO 19650 requirements specified in the employer information requirements — requiring a complete restructure of a live project environment
With Accienta customisation
Your team opens Autodesk Forma on day one and finds a working environment — folder structure built to ISO 19650 and your BEP, RFI workflows aligned to your contract, permission levels set by company and role, and site forms matching your ITP documents. Everything configured before the first user logs in
Your folder structure is designed by Accienta before any data is migrated — project information containers, discipline folders, document states, naming convention enforcement and archive structure that meets your employer information requirements from the first document issue
RFI workflows are configured for your contractual structure — routing to the right consultants, with the right response periods, automatic overdue escalation and audit trail reporting that protects your team from contractual risk on every GCC project
Site teams go live with snagging categories built from your contract specification, ITP checklists built from your quality management documents and daily report templates matching your project reporting requirements — the mobile environment reflects their work from day one
Your CDE is compliant with your employer information requirements before your first document is issued — backed by Accienta's formal Autodesk accreditation in BIM 360 Docs, BIM 360 Build and Autodesk project management tools

Six Areas Where Accienta Customises Autodesk Forma for Your GCC Project

Accienta's customisation service covers every part of the Autodesk Forma platform that affects how your team delivers a GCC construction or infrastructure project. Each area is configured to your specific project requirements — not to a generic template that any GCC firm could use.

Foundation

Project Structure and Folder Hierarchy

Accienta designs your Autodesk Forma project structure before any data is uploaded — project information containers, discipline folders, document type breakdown and archive structure. We configure document naming conventions aligned to ISO 19650 and validate them against your employer information requirements before a single folder is created in the platform.

ISO 19650-aligned CDE states — WIP, Shared, Published, Archived
Document naming convention built from your BEP
Discipline folder structures by project phase
Drawing register configuration and automation
GCC relevance

Dubai Municipality, MOMRA, Ashghal and DEWA authority submissions require specific document set organisation — Accienta structures your CDE to support these submission requirements from the first document issue

Access Control

User Roles, Permissions and Team Access

Accienta configures user roles and permission levels for every stakeholder in your project — main contractor, subcontractor, consultant, client and authority reviewer. One of the most powerful and most commonly misconfigured features in Autodesk Forma is the ability to control exactly who can see, upload and approve which documents. Accienta sets this up correctly before a single team member is invited to the platform.

Company-level and role-level permission separation
Subcontractor document portal access — scoped to their work package
Client and authority view-only access for specific document sets
BIM manager admin rights for CDE administration
GCC relevance

GCC projects with 30 to 50 subcontractors across multiple countries require precisely configured access management — preventing document access errors that create contractual disputes and compliance failures

Workflows

RFI, Submittal and Approval Workflow Configuration

Accienta configures your RFI and submittal workflows for your specific contract structure — contractor-to-consultant routing, contractual response periods, discipline-specific review paths, automatic overdue escalation and audit trail reporting. On GCC construction projects where RFI response times are governed by contract and delays create extension of time claims, a correctly configured workflow is a contractual protection tool — not just a convenience feature.

RFI routing matched to your contract consultant structure
Contractual response periods and automatic overdue escalation
Submittal review workflows by discipline and review path
Notification automation — approval reminders and escalation alerts
GCC relevance

NEOM, Aramco and UAE developer contracts have specific RFI response time obligations — Accienta configures Forma's workflow to enforce these contractually, protecting your team from time-bar failures and extension of time disputes

Field Setup

Mobile Field Configuration — Snagging, QA and Site Reports

Accienta configures Autodesk Forma Build's mobile environment for your site team before field teams go to site — snagging categories built from your contract specification sections, quality inspection checklists from your ITP documents, safety observation forms aligned to your HSE management system and daily report templates matching your project reporting requirements. This is the configuration that achieved a 60% reduction in snagging administration time at Khansaheb.

Snagging categories by trade and contract specification section
ITP quality inspection checklists by work package
Punch list zones by floor, area and building block
HSE forms, incident reporting and permit to work tracking
Proven GCC outcome

60% snagging admin reduction — Khansaheb, one of the UAE's largest construction contractors — achieved through Accienta's Forma Build mobile field configuration on an active UAE construction project

BIM Integration

Revit, Civil 3D and Navisworks Integration

Accienta connects your Autodesk Forma environment to your BIM authoring tools — configuring Revit model publishing workflows, Civil 3D drawing output connections and Navisworks clash detection upload workflows into Forma. When this integration is configured correctly, your design and construction management environments are a single connected system — model issues in Revit appear as issues in Forma without manual transfer, and clash detection results in Navisworks link directly to design team responsibilities in Forma.

Revit model publishing to Forma Data Management CDE
Civil 3D drawing output workflows into Forma document management
Navisworks clash detection linked to Forma issue tracking
Design issue tracking connected to specific model elements
Proven GCC outcome

Zero coordination clashes reaching construction — Mira Developments, UAE — achieved through Accienta's Navisworks and Forma integration configuration on a live UAE real estate development project

Commercial

Cost Management and Automation Setup

Accienta configures Autodesk Forma's cost management tools for GCC construction project commercial structures — budget setup by cost code and work package, cost event logging for variations and claims, subcontractor payment application management and cost reporting dashboards for project director and client visibility. We also configure Autodesk Construction Cloud's automation capabilities — setting up notification rules, approval workflows and issue tracking automations that reduce manual administrative overhead for your project management team.

Budget structure by cost code, work package and subcontractor
Variation and cost event logging workflows
Notification automation — approval reminders, overdue alerts, escalation
Reporting dashboards for PMO and client-facing cost visibility
GCC relevance

GCC programmes where weekly cost reporting to client is contractual and cost overruns trigger penalties need real-time cost visibility — Accienta configures Forma's cost environment to produce this without manual Excel consolidation

What Accienta's Customisation Has Delivered on Live GCC Projects

These are not claims — they are documented outcomes from Accienta's customisation and implementation work on live GCC construction and development projects, published on Accienta's own platforms.

60%
Snagging admin time reduction
Khansaheb — one of the UAE's largest construction contractors — achieved through Accienta's Forma Build mobile field configuration on an active UAE construction project
0
Coordination clashes reaching construction
Mira Developments — UAE real estate developer — achieved through Accienta's full BIM transformation covering Revit, Navisworks and Autodesk Forma integration
100%
Digital project records
NSCC — achieved complete digital construction records through Accienta's Autodesk Construction Cloud document management and workflow customisation

How Accienta's Customisation Process Works — Step by Step

Accienta's customisation process follows the same structured approach on every engagement — starting with your specific project requirements and ending with a configured Autodesk Forma environment that your team uses from the first login, not after weeks of self-guided setup.

1
Needs Assessment

We Map Your Workflows Before Touching the Platform

Accienta starts every customisation engagement with a thorough needs assessment — working closely with your team to understand your construction workflows, your contract structure, your team composition, your authority submission requirements and the specific areas where Autodesk Forma will bring the most value. We review your BIM Execution Plan, your employer information requirements and your project delivery process before configuring anything. This is what Accienta's own website describes as "a thorough analysis of your organisation's specific needs and goals" — and it is what prevents the most common customisation failure: configuring a platform for a generic project that does not match how your team actually works.

2
Strategy and Design

We Design the Configuration on Paper Before Building It in the Platform

Based on the needs assessment, Accienta develops a customisation strategy — defining how projects will be organised, setting user roles and permissions by company and discipline, identifying integrations with other software in your environment and designing the folder structure, naming convention and workflow architecture before a single setting is changed in the platform. Your BIM manager and document controller review and approve the configuration design before deployment begins — so what gets built reflects what your team needs, not what Accienta assumed they needed.

3
Build and Configure

We Build Your Environment — Project Structures, Workflows, Permissions and Templates

Accienta configures your Autodesk Forma environment from the ground up — creating and managing projects, establishing standardised folder structures, building RFI and submittal workflows, setting up user roles and permissions, configuring mobile field forms and templates, connecting BIM tools and setting up automation rules including notifications, approval workflows and issue tracking. Every component is tailored to your process — not generic settings that any GCC firm could use. This is what our own clients describe as implementation that "really made the difference to our adoption and technical capabilities."

4
Handover and Training

We Walk Your Team Through What We Built — On Their Own Live Environment

After configuration is complete, Accienta walks your team through everything built — explaining how each part of the configured environment works and making sure it is fully aligned with your internal processes. Training is delivered role by role — project managers on dashboards and reporting, document controllers on transmittal workflows, site engineers on mobile observations and BIM managers on CDE administration. Every session is delivered on your own live Autodesk Forma environment, not a demonstration account that does not reflect how your team works.

5
Ongoing Support

We Stay in the Loop — Adjusting as Your Needs Evolve and the Platform Updates

After go-live, Accienta provides ongoing support — resolving technical issues, making adjustments as your project requirements evolve, monitoring the effectiveness of the customised configuration and conducting regular check-ins to discuss progress and address any concerns. After a defined implementation period, Accienta and your team review the outcomes — assessing whether the customisation has delivered the expected improvements and planning further adjustments for the next project phase. As Autodesk updates the Forma platform, Accienta advises on changes that affect your configured environment and reconfigures where necessary — so you are never surprised by a platform update that silently breaks a workflow your team relies on.

Every Autodesk Forma Product Accienta Configures for GCC Projects

Accienta's customisation service covers every product within the Autodesk Forma platform — the unified construction cloud that was formerly known as Autodesk Construction Cloud. Each product is configured separately and connected as part of a single integrated project environment.

Forma Build

RFI management, submittal workflows, snagging, quality inspections, safety observations, cost management and mobile site delivery — formerly Autodesk Build

Formerly Autodesk Build

Forma Data Management

Document control, drawing registers, transmittals, version control, revision management and ISO 19650 CDE — formerly Autodesk Docs

Formerly Autodesk Docs

Forma Design Collaboration

Cloud BIM coordination, Revit cloud worksharing, clash detection, model coordination and ISO 19650 CDE for design teams — formerly BIM Collaborate Pro

Formerly BIM Collaborate Pro

Autodesk Forma (Platform)

The unified industry cloud — account administration, hub management, cross-product integrations, enterprise controls and unified data environment across all Forma products

Formerly Autodesk Construction Cloud

Navisworks Integration

Clash detection configuration, model federation, search sets and viewpoints — connected to Forma for issue tracking and coordination workflow management

Autodesk Navisworks

Revit and Civil 3D Connections

Model publishing workflows from Revit and Civil 3D into Forma — connecting your BIM authoring environment to your project management and document control platform

Autodesk AEC Collection

Autodesk Forma Customisation — Answered

The questions GCC project managers, BIM managers and document controllers ask before engaging Accienta for Autodesk Forma customisation. Every answer is factual.

RebrandDoes the March 2026 renaming of Autodesk Construction Cloud to Autodesk Forma affect my existing configuration? +
No — the March 2026 renaming is a branding change only. Autodesk has confirmed that existing licences, projects, workflows, folder structures, permissions and API connections are completely unchanged. Forma Build is the new name for Autodesk Build. Forma Data Management is the new name for Autodesk Docs. Forma Design Collaboration is the new name for BIM Collaborate Pro. If Accienta configured your Autodesk Construction Cloud environment before March 2026, everything works exactly as it did — you will simply see updated branding in the interface. If you have not yet had your environment configured, Accienta configures it under the Forma product names with the same underlying platform capabilities.
We already have ACCWe already have Autodesk Construction Cloud / Forma licences — can Accienta fix a poorly configured environment? +
Yes — and this is one of the most common Accienta engagements in the GCC. Many firms purchased Autodesk Construction Cloud or Forma licences, set up a basic environment themselves or through a generic reseller and are now on a live project with a platform configuration that does not match how their team actually works. Accienta audits your existing environment, identifies configuration gaps against your project requirements and employer information requirements, and reconfigures the platform without disrupting your live project data. Where the existing folder structure needs to be redesigned, Accienta manages the data migration from the old structure to the new one. Contact Accienta with your current situation — a 30-minute call will tell you what needs to change and how long it will take.
ISO 19650Can Accienta configure Autodesk Forma to meet ISO 19650 requirements on NEOM and UAE developer projects? +
Yes — Accienta configures Autodesk Forma Data Management to ISO 19650 requirements — work-in-progress, shared, published and archived document states, folder structures aligned to your information delivery milestones, naming conventions matched to your BEP and approval workflows that route document issues through the correct review and sign-off chain. Accienta holds formal Autodesk accreditation in BIM 360 Docs — the predecessor to Forma Data Management — which demonstrates verified expertise in construction document management and CDE configuration. On NEOM, Aramco and UAE developer projects where ISO 19650 compliance is audited at design stage gates, an incorrectly configured CDE will fail the employer's information audit. Accienta designs the structure correctly before any document is issued — not after the problem is discovered mid-project.
TimelineHow long does Autodesk Forma customisation take? +
Customisation timeline depends on which Autodesk Forma products are being configured and the complexity of your project requirements. A focused Forma Build mobile field configuration — snagging templates, ITP checklists, RFI workflows and permission setup — typically takes five to eight business days. A Forma Data Management CDE configuration — folder structure design, naming convention setup, transmittal workflows and permission management — typically takes five to eight business days. A Forma Design Collaboration environment — ISO 19650 CDE, cloud worksharing and clash detection configuration — takes six to ten business days. A comprehensive multi-product configuration covering Forma Build, Forma Data Management and Forma Design Collaboration together is scoped based on your specific requirements. Contact Accienta for a timeline specific to your project scope — most urgent deployments can be prioritised to have a working environment within five business days.
AutomationCan Accienta set up automation within Autodesk Forma to reduce manual admin? +
Yes — Autodesk Forma includes automation capabilities that Accienta configures as part of the customisation service. This includes notification automation — automatic alerts when RFIs are overdue, when submittals reach their review deadline or when approvals are pending beyond a set number of days. It includes approval workflow automation — routing documents through the correct review chain without manual intervention from your document controller. It includes issue tracking automation — automatically assigning issues to the responsible party based on discipline or trade category and escalating overdue items to the project manager. These automations are what reduce the manual administrative overhead that your document controller, project manager and QA manager currently spend on chasing status updates — which is the mechanism behind the 60% snagging administration reduction Accienta achieved at Khansaheb.
PricingHow does Accienta price customisation services? +
Accienta prices customisation services per engagement based on the specific scope of configuration required — the number of Autodesk Forma products being configured, the complexity of your project structure and workflow requirements, the number of team members being set up and trained and whether data migration from a previous platform is included. We do not charge a standard day rate applied regardless of what your team actually needs. After the discovery conversation, Accienta produces a proposal with a defined scope, timeline and fee — so you have full cost visibility before committing. Where customisation accompanies a licence purchase from Accienta, both costs are presented in a single combined proposal. Contact Accienta for a scoped proposal based on your specific project and platform requirements.

Your Team Has the Autodesk Forma Licences. Let Accienta Make the Platform Actually Work for Your GCC Project.

Every day your team is on a live project with an unconfigured or poorly configured Autodesk Forma environment is a day of RFIs being tracked by email, snagging being logged on paper and drawings being distributed through WhatsApp — all of which create contractual risk, version confusion and the exact problems Autodesk Forma was purchased to prevent. A 30-minute call with Accienta starts the process of fixing this — free, no commitment and the only honest way to understand what your specific environment needs.

Autodesk Gold Partner — EMEA & GCC
BIM 360 Docs & Build accredited
60% snagging reduction — Khansaheb
0 clashes on site — Mira Developments
Configured before your team logs in
Scroll to Top